« Bathroom Pumbing - Done! | Main | No More Panel Ceilings »
October 6, 2006
The Last of the Grouting
We now have all the tile work laid and grouted. The only thing left to do for the countertops is to let it dry, paint the wood piece that sets it front of the tile, and attach the wood piece on the side.
Some photos of the finished tile work, although the grout is a bit dark above the stove & by the wood front pieces since its still wet...


To finish the kitchen out here is the list:
1.Gut Room
2.Add Insulation
3.Replace Sheetrock
4.Build Cabinets
5.Float Sheetrock
6.Paint walls
7.Install window molding
8.Add window doo-dads
9.Install new chandelier
10.Install new kohler sink
11.Install new faucet
12.Lay formica countertop
13.Buy cabinet hardware
14.Install cabinet hardware
15.Buy new doorknob
16.Install new doorknob
17.Fix sloping floor
18.Take up old floor
19.Lay down new wood floor
20.Stain new wood floor
21.Buy new door
22.Install new door
23.Re-lay a tile countertop
24.Buy Stove Vent
25.Build Stove Vent area
26.Take down chandelier
27.Install new kitchen light
28.Install switch/outlet covers
29.Refresh paint on trim
30.Replace new door (thank you children!)
31.Buy paint for door
32.Paint new door
33.Buy Ceiling molding
34.Paint Ceiling molding
35.Install ceiling molding
36.Buy baseboards
37.Paint baseboards
38.Install baseboards
39.Fix bottom cabinets
40.Paint/stain cabinets
41.Prepare boards for new wood floor.
42.Lay wood flooring
43.[If no upper cabinets] Touch up ceiling